From Module Yard to Warehouse: Every Fee a Grower Pays a Cotton Gin, Explained

published on 17 January 2026

TL;DR

Most cotton growers see only one or two line items—“ginning,” maybe “storage”—but from the gin’s side, there are distinct fees that cover different steps: receiving modules, drying and cleaning, ginning and pressing, bagging and ties, storage, handling, and a bundle of small assessments. Each region and gin uses its own mix of per‑bale, per‑hundredweight, and bundled charges, yet the underlying logic is the same: pay for the energy, labor, and capital required at each stage while keeping the invoice simple enough that growers don’t revolt. Understanding what each charge really covers helps you compare gins, negotiate terms, and decide whether premium services are worth it for your operation.


1. Module Yard: Receiving, Unloading, and Yard Fees

The first potential cost shows up when your modules hit the gin yard.

  • Receiving or yard fee. Some gins list a separate “receiving” or “yard” fee that covers the labor, tractors, and equipment used to unload modules, place them in the right queue, and track them through the plant. Others roll this into a single ginning charge so you never see it itemized.
  • Hauling charges. If the gin arranges pickup from your field, there may be a per‑module or per‑mile hauling charge. In other cases, custom harvest crews bundle hauling into their own rate and the gin simply notes that modules were “producer delivered.”

In older fee schedules, gins sometimes charged by the hundredweight of seed cotton delivered (per 100 pounds of seed cotton), which implicitly included yard work. Modern fee structures are more often per‑bale, but the cost of unloading and staging modules is still there—it is just hidden inside the broader line.

For you as a grower, the questions to ask are:

  • Is the yard fee embedded in the ginning charge, or is it separate?
  • If the gin provides hauling, is it competitive with independent module haulers, especially for long runs?

2. Drying and Cleaning: The Hidden Energy Charge

Before cotton hits the gin stands, most facilities run it through dryers and pre‑cleaners. This is one of the most energy‑intensive parts of the operation.

Key components of this stage:

  • Drying fuel or energy cost. High‑moisture cotton needs more heat and air, which means more fuel (gas or propane) and more fan horsepower. Some gins add a separate charge when cotton exceeds a moisture threshold; others simply bake that cost into a higher base fee for regions where drying is always needed.
  • Pre‑cleaning. Removing sticks, burs, and leaves before the stands protects equipment and improves lint quality. The capital cost of this equipment plus the power to run it is covered mostly by the standard ginning fee.

A few gins explicitly list a “drying charge” when cotton is above a threshold (for example, an extra amount per bale if moisture exceeds a set percentage), which can come as a surprise when a wet year hits. If you farm in an area prone to late, damp harvests, it is worth clarifying how your gin handles moisture: is there a surcharge, or does everyone share the averaged‑out cost?


3. The Core Ginning Fee: Where Most Growers Focus

The headline item on almost every grower statement is simply “Ginning.” This is the charge for the main sequence of operations: feeding the cotton, running it through the gin stands, separating lint and seed, and moving the lint toward pressing.

Common ways this fee is structured:

  • Per bale (most common today). One flat rate per 480‑lb equivalent bale, often quoted as “X dollars per bale including bagging and ties,” sometimes with a separate line for bagging.
  • Per hundredweight of seed cotton. An older but still used method in some places, where the gin weighs seed cotton and charges per 100 pounds; the conversion to bales is effectively built in.

That single fee has to cover:

  • Labor on the gin floor
  • Power to run stands, fans, and conveyors
  • Repairs and maintenance
  • Insurance, depreciation, and basic overhead

Because growers tend to shop gins on this number, managers work hard to keep the posted fee competitive while quietly using other small charges or side revenues (seed, trash, storage) to keep the books healthy. From the grower perspective, comparing fees only makes sense alongside actual lint turnout, seed accounting, and quality; a slightly higher ginning fee can be worth it if turnout and classing results consistently yield better checks.


4. Bagging, Ties, and Bale Packaging

Once lint is ginned, it is pressed into bales and secured with bagging and ties (wire or strap). Rather than treating this as a separate business, most gins either:

  • Include bagging and ties in the ginning fee, e.g., “30 dollars per bale including bagging and ties,” or
  • List a lower ginning fee plus a separate line item for bagging and ties to reflect actual material costs when prices of steel or plastics change.

In some regions and older fee structures, growers may see different combinations:

  • A per‑bale charge for bagging and ties
  • A surcharge if alternative packaging is requested (for example, certain wrap types or organic‑certified materials)

It’s useful to know whether your gin passes through packaging cost increases or absorbs them. A year with a spike in steel prices, for example, can make the “bagging and ties” line noticeably larger; understanding that it is driven by material cost, not by the gin’s margin, can prevent misunderstandings.


5. Cottonseed, Lint Value, and How They Show Up on the Statement

While ginning and packaging are clear charges, cottonseed and lint value are where inflows and outflows intersect.

Typical patterns:

  • Cottonseed handled separately. The gin credits the grower for cottonseed at an agreed‑upon price per ton or per bale equivalent, then subtracts ginning and other fees from the combined value of lint and seed.
  • Cottonseed pooled. In many co‑ops, cottonseed value is pooled and distributed later as part of a patronage or seasonal settlement, so it may not show as a line‑by‑line credit on the first statement.
  • Seed retained as partial payment. In some arrangements, especially historically, a gin might keep all or part of the cottonseed as compensation for ginning rather than writing separate checks.

From a “fee” standpoint, these mechanics matter because the ginning fee does not tell the whole story of what the gin is extracting in value; cottonseed marketing arrangements can effectively increase or decrease your net cost of ginning even if the posted per‑bale fee is the same as your neighbor’s. Paying attention to the net settlement—lint value plus seed minus all charges—is more important than focusing on any one line.


6. Warehouse Storage and Handling Charges

Once bales are pressed and tied, many gins move them into on‑site or nearby warehouses. The warehouse side typically has its own schedule of fees that may appear on your gin statement or on a separate warehouse invoice.

Common items:

  • In‑handling fee. Charged when the bale is first received into the warehouse; covers unloading, stacking, and entry into the warehouse management system.
  • Monthly storage fee. A per‑bale charge for each month (or part of a month) that the bale remains in storage before shipping or sale.
  • Out‑handling (or load‑out) fee. Charged when bales are shipped, covering retrieval, staging, and loading onto trucks or rail cars.

Sometimes, gins and warehouses are allied but separate businesses; in other cases, the co‑op owns both and rolls charges into a combined marketing and storage plan. In either structure, storage and handling can quietly add several dollars per bale over the season, especially if cotton sits in the warehouse for long periods before sale.

Growers who routinely store cotton for months while waiting on better basis or premiums should be particularly aware of these charges, because long storage can erode part of the price improvement they are hoping to capture.


7. Classing, Checkoff, and Miscellaneous Assessments

Beyond the big operational fees, there is a cluster of smaller per‑bale charges that may appear together:

  • Classing fees. USDA’s classing service is generally charged per sample; in many cases, merchants or co‑ops handle this and recover it through basis and price, but some fee schedules itemize part of the cost.
  • Industry and research assessments. National or regional organizations sometimes levy small per‑bale fees to support research, promotion, or industry programs. These may be passed through on grower invoices under generic labels.
  • Insurance and handling fees are tied to specific programs. For cotton going into special pools, loan programs, or branded initiatives, there can be small fees to cover extra paperwork, inspections, or certifications.

Individually, these items are small, but together they can add another dollar or more per bale. Knowing what they are and who benefits (industry‑wide, the co‑op, the warehouse, or a specific marketing program) helps you decide whether the associated program is delivering value to your farm.


8. Premium Services: Identity‑Preserved, Organic, and Specialty Lots

Gins increasingly offer premium services that carry their own fee structure, either as add‑ons or as higher base rates:

  • Identity‑preserved and variety‑specific handling. If you need your cotton kept separate for specific contracts—organic, regenerative, certain fiber properties—the gin must segregate modules and bales, schedule cleanup, and manage more complex paperwork. This often comes with a higher ginning fee or a per‑bale IP charge.
  • Organic and sustainability certifications. Certified handling usually requires extra documentation, inspections, and sometimes different materials, all of which justify a surcharge. In good arrangements, these extra fees are more than offset by the premium you receive on lint.
  • Data and advisory services. Some gins offer detailed reporting on quality metrics, field comparisons, and even agronomic recommendations, either bundled into fees or as a separate “services” line.

From a grower’s point of view, the key is to treat these as investments tied to specific contracts: if a branded program or premium market is paying you more than the additional gin and certification costs, it may be a good deal; if not, you are cross‑subsidizing a premium service without enough upside.


9. Putting It Together: A Sample Statement Walk‑Through

A simplified example for a grower delivering enough cotton to produce 100 bales might look like this:

  • Ginning (including bagging and ties): 100 bales × 30 dollars
  • Hauling and yard fees: 100 bales equivalent of modules × 2 dollars
  • Drying surcharge (wet year): 100 bales × 3 dollars
  • Storage and handling (two months): 100 bales × 4 dollars
  • Miscellaneous assessments and classing: 100 bales × 1.50 dollars

Total explicit charges: about 4,050 dollars, or roughly 40.50 dollars per bale in this hypothetical. Against that, the statement would show lint proceeds (based on classing and price) plus any cottonseed or program premiums net of marketing costs. The gin’s income is not just your line‑item “ginning” fee but the combination of that and the margins it retains from seed, trash, storage, and any services it owns further down the chain.

For you, understanding each line lets you ask better questions:

  • Is the ginning fee truly “all‑in,” or are you seeing significant add‑ons for drying and storage each year?
  • Are storage and handling charges reasonable relative to how long you leave cotton in the warehouse?
  • If you pay for premium or identity‑preserved handling, are you capturing enough extra value in the lint price to justify the additional fees?

When you know what every fee is paying for—from module yard to warehouse door—you are better positioned to compare gins, negotiate terms, and decide which services are worth it for your operation.

Related Blog Posts

Read more

Want To Work With Us?